The Southeast Louisiana Urban Flood Control Project, known as SELA, is a Corps of Engineers program that upgraded canals and pump stations in Jefferson and Orleans parishes to handle a 10-year rainfall, about 9 inches in 24 hours. In Jefferson Parish, work on 24 canals and six pump stations was finished in 2017. Bigger or faster rains can still flood streets and houses.

What SELA is
According to the U.S. Army Corps of Engineers New Orleans District, SELA reduces the risk of flood damage from rainfall in Orleans, Jefferson and St. Tammany parishes. It generally supports each parish's master drainage plan. Key points:
- Design level. Flood risk reduction up to a 10-year rainfall event, a storm with a 10% chance of happening in any year. For this area, the Corps says that's roughly 9 inches of rain in 24 hours.
- Scale. More than $2 billion of improvements in Jefferson and Orleans parishes combined.
- St. Tammany. Planned improvements there, such as channel enlargements, detention ponds, levees and elevating flood-prone buildings, are not yet funded.
SELA deals with rain. It is separate from the hurricane levees and floodwalls that hold back storm surge.
What was built in Jefferson Parish
The Corps says that in Jefferson Parish, improvements to 24 drainage canals, added pumping capacity at four pump stations, and two new pump stations were completed in 2017. Some of the listed projects:
East Bank
- Soniat Canal, from Lester to West Metairie, completed spring 2016.
- Harahan Pump to the River: intake canal, north and south discharge tubes, discharge structure and pump station, all completed in 2017. This lets the area pump drainage water directly to the Mississippi River.
West Bank
- Industry Canal, completed summer 2016.
- Trapp Canal, completed summer 2017.
- Murphy Canal North (end of 2016) and South (summer 2015).
The Corps also lists a separate SELA Kenner project page. In Orleans Parish, work covers 16 major drainage lines and four pump stations, with most projects finished and a few, including parts of Algiers, still under construction or design.
What "10-year" really means
A 10-year rain isn't a storm that happens once a decade. It has about a 10% chance of happening in any given year, so over three decades, the odds of seeing at least one are high. And the design standard describes a total over 24 hours. Rain that falls much faster, a few inches in an hour or two, can still overwhelm street drains and the subsurface lines that feed the canals, even when the canals themselves have room.
That's what homeowners in Metairie, Kenner and the West Bank see in practice:
- Street flooding in intense bursts, even in years when canals never overtop.
- Low slab houses and garages at the bottom of a block get water first.
- Storms bigger than the design, like the May 1995 flood, will still flood homes. An earlier post on this site covers the May 1995 flood.
- Pump stations need power and staff. A system designed for 9 inches only performs if pumps are running when the rain comes.
How to read your own risk
- Watch your street, not just the forecast. Note how deep water gets at your curb and driveway in heavy rain. That's your real drainage level.
- Check your floor height. A slab a few inches above the street floods in events a raised house shrugs off. An elevation certificate gives the exact number.
- Keep street drains clear. Leaves and grass clippings in catch basins slow drainage on your block.
- Consider flood insurance even outside a high-risk zone. Rain flooding isn't covered by standard homeowners policies.
- Move cars and valuables up when intense rain is forecast.
After a rain flood
Rainwater that comes in from the street is floodwater. It carries runoff, oil and often sewage from overloaded lines, so it isn't clean. Wet carpet, pad, drywall and insulation generally need to come out, and the house needs to be dried within 24 to 48 hours to limit mold. Photograph the waterline and keep samples for your adjuster.
For the extraction and drying side, see water damage restoration. The Metairie page covers Jefferson Parish flood history and housing.
Ask for help here and your request is handed to one local cleanup company, who may call or email you.
FAQs
What is the SELA project?
The Southeast Louisiana Urban Flood Control Project, a Corps of Engineers program that reduces rain flooding risk in Orleans, Jefferson and St. Tammany parishes by improving canals and pump stations.
How much rain is SELA designed for?
A 10-year rainfall event, which the Corps says equals about 9 inches in 24 hours for this area.
Is SELA finished in Jefferson Parish?
The Corps says Jefferson Parish canal and pump station improvements were completed in 2017, though some separate projects, such as SELA Kenner, have their own status.
Can my house still flood from rain?
Yes. Rain heavier or faster than the design level, blocked drains or pump problems can still flood streets and low houses.
Sources
- U.S. Army Corps of Engineers, New Orleans District, Southeast Louisiana Urban Flood Control Project (SELA).
- CDC, Guidelines for Cleaning Safely After a Disaster.